Tower sections of GE’s 12-MW offshore wind turbine shipped to prototype site

Tower sections of GE’s 12-MW offshore wind turbine shipped to prototype site

GE Renewable Energy announced the shipment of the four tower sections that will be part of GE’s Haliade-X 12 MW prototype to be installed later this summer in Maasvlakte-Rotterdam (NL). The four segments at tower manufacturer GRI’s site in Seville, will be arriving in the Netherlands before the end of the month.

Click to Read  Macquarie, BNEF Create Carbon Score Tool For Solar, Wind Assets
3
Like
Save